In 2019 infrastructural renovations were started in Jan Sofat North, East and South. Jan Sofat West followed in 2022. CWM installed HDPE-water pipes, fiber optic cables, repaved the sidewalks with dark-grey pavers and resurfaced the roads with a new layer of asphalt.
In 2022 Jan Sofat’s infrastructural face-lift was successfully completed.
In early 2021 Phase 6 was finalized with turn-key apartments and villas.
Phase 1 was the first part of the six development phases of Jan Sofat and focused on waterfront houses.
© Copyright Jan Sofat | Website by Koa Creatives